Apex builds new pools and remodels older ones across Mesa, where much of the housing stock still runs its original 1980s-90s pool. Remodels get new plaster or pebble, waterline tile, coping and modern equipment. New builds are planned around mature landscaping, older block walls and tight side-yard access, and because the soil is East Valley caliche, we scout it before we quote.

Mesa, Arizona
Custom Pool Builder in Mesa, AZ
Serving Mesa and nearby Gilbert, Chandler and Tempe.
Our services
What we build in Mesa
New builds, remodels and resurfacing

Ground-up gunite pools designed in 3D around your yard. Pool and spa combos, spools and cocktail pools included.

New tile, coping, decking and equipment that bring an older Valley pool up to date.

New plaster, pebble or quartz interior - your pool, reborn.
Straight answers
Mesa pool questions
Answered for this town
How long does it take to build a pool in Arizona?
A new Mesa pool runs the usual 3 to 6 months from contract to swimming, with 8 to 16 weeks of active construction. A remodel or resurfacing job - very common on Mesa's older pools - is much faster, often just a few weeks depending on scope. Either way we publish the schedule up front so you know what to expect.
Who pulls the permits?
Your builder does, and Apex coordinates it. Construction is performed by a licensed, bonded and insured Arizona contractor, who pulls every permit under their ROC license and schedules the city inspections at each stage: the pre-gunite inspection before the shell is shot, and the final inspection at the end. Apex manages the whole process so you never have to call the city or stand in line at a permit counter. You will receive your builder's ROC license number on your written contract and can verify it anytime at the Arizona Registrar of Contractors (roc.az.gov).
What about my HOA?
If your neighborhood has an HOA, we prepare the full submittal package (the site plan, elevations, and any materials the board asks for) and manage the review for you. In master-planned communities around Gilbert, Queen Creek, and San Tan Valley, HOA approval usually takes about 2 to 4 weeks. We start that submittal as early as possible because it runs in parallel with engineering, so it rarely adds to the total timeline if we begin on day one.
What is caliche and why does everyone mention it?
Mesa sits squarely in the East Valley, so caliche is common under new digs here. On older lots we also work around mature landscaping and existing walls, which can affect access. We scout the ground at the design visit and plan a slower excavation honestly, so it never becomes a surprise later.
Will monsoon season delay my build?
It can. From roughly July through September, monsoon storms can shut down a dig day or a shotcrete day for safety, and a flooded excavation has to be pumped out before we continue. The National Weather Service marks Arizona's monsoon season as June 15 through September 30. We build weather days into the published schedule so a normal monsoon season does not blow up your timeline, and if a storm costs us a day, you see it reflected honestly rather than hidden.
How do I keep the water cool in a 115° summer?
A pool that sits in full Arizona sun can climb into the 90s by August, which stops feeling refreshing. The main fix is a chiller or a reversible heat pump that pulls heat back out of the water, and the same unit can warm the pool in winter. Design choices help too: shade over part of the water, and knowing that darker interior finishes run a few degrees warmer. On a smaller spool, the jets keep water circulating, which also helps it shed heat overnight.
Can I swim by summer?
Yes, if you start in time. Because the full timeline runs 3 to 6 months, contracting in early fall through winter puts you on track to swim by spring or early summer. Summer is our busiest stretch, so the earlier you lock in a design and get into the permit queue, the better your odds of hitting a specific deadline. We publish the schedule so you can hold us to the date we give you.