Custom Pool Builder in Scottsdale, AZ

Serving Scottsdale and nearby Phoenix, Mesa and Tempe.

Apex builds view-lot and negative-edge pools across Scottsdale, where the land drives the design. On hillside lots around Troon, DC Ranch and the McDowells, a vanishing edge has to sit dead level on sloping ground, and many communities run strict design review boards on top of city permitting. We build to that standard and prepare the submittal carefully - in Scottsdale the board is often the real gatekeeper.

Nearby: Phoenix, Mesa, Tempe

Our services

What we build in Scottsdale
New builds, remodels and resurfacing

A raised spa spilling into a pool past glass-tile scupper bowls, with desert mountains turning pink at sunset.
ServiceNew Pool Build

Ground-up gunite pools designed in 3D around your yard. Pool and spa combos, spools and cocktail pools included.

Turquoise pool water meeting new bullnose coping and irregular flagstone decking, seen from above.
ServicePool Remodeling

New tile, coping, decking and equipment that bring an older Valley pool up to date.

Close-up of sunlit teal pool water rippling over a mottled pebble interior finish.
ServicePool Resurfacing

New plaster, pebble or quartz interior - your pool, reborn.

Straight answers

Scottsdale pool questions
Answered for this town

How long does it take to build a pool in Arizona?

Plan on 3 to 6 months from signed contract to your first swim, with roughly 8 to 16 weeks of active construction once we break ground. The wildcard is almost always permits and HOA approval, which can take anywhere from a few weeks to a couple of months depending on the city and your community. We publish the schedule up front and start the permit and HOA work early so the paperwork is not what holds you up.

Who pulls the permits?

Your builder does, and Apex coordinates it. Construction is performed by a licensed, bonded and insured Arizona contractor, who pulls every permit under their ROC license and schedules the city inspections at each stage: the pre-gunite inspection before the shell is shot, and the final inspection at the end. Apex manages the whole process so you never have to call the city or stand in line at a permit counter. You will receive your builder's ROC license number on your written contract and can verify it anytime at the Arizona Registrar of Contractors (roc.az.gov).

What about my HOA?

In much of Scottsdale the gatekeeper is a design review board, not just a standard HOA. These boards enforce material, color, and finish standards on top of city permitting, and the review can take a few weeks. We prepare the submittal package to that higher standard and manage the process so it runs alongside engineering.

What is caliche and why does everyone mention it?

Scottsdale ground is not only caliche - north of the 101, hillside lots can hit decomposed granite and solid rock, which is even slower to excavate. On view lots the slope adds its own challenges. We assess the ground at the design visit and plan a hard dig honestly, up front.

Will monsoon season delay my build?

It can. From roughly July through September, monsoon storms can shut down a dig day or a shotcrete day for safety, and a flooded excavation has to be pumped out before we continue. The National Weather Service marks Arizona's monsoon season as June 15 through September 30. We build weather days into the published schedule so a normal monsoon season does not blow up your timeline, and if a storm costs us a day, you see it reflected honestly rather than hidden.

How do I keep the water cool in a 115° summer?

A pool that sits in full Arizona sun can climb into the 90s by August, which stops feeling refreshing. The main fix is a chiller or a reversible heat pump that pulls heat back out of the water, and the same unit can warm the pool in winter. Design choices help too: shade over part of the water, and knowing that darker interior finishes run a few degrees warmer. On a smaller spool, the jets keep water circulating, which also helps it shed heat overnight.

Can I swim by summer?

Yes, if you start in time. Because the full timeline runs 3 to 6 months, contracting in early fall through winter puts you on track to swim by spring or early summer. Summer is our busiest stretch, so the earlier you lock in a design and get into the permit queue, the better your odds of hitting a specific deadline. We publish the schedule so you can hold us to the date we give you.

Ask us about your own yard